With limited specialist HV technicians employed on-site to asssit with the management of electrical infrastructure and electronic systems, Ampcontrol was engaged to provide time critical HV field services to minimise production losses.
Tag: Darwin
Case Study – Channel Island Power Station Upgrade
Ampcontrol was commissioned to scope and complete the required work to successfully upgrade major asset protection relays as part of a site wide shutdown.
Case Study – Bladin Point LNG Processing Facilities
Working in partnership with the customer, Ampcontrol diagnosed and carried out transformer repairs, oil testing and regeneration successfully and to a high standard.